TREMBLE technical manual

     
Next: 5.1.1 Software Up: 5 Testing Plan Previous: 5 Testing Plan

5.1 Component Testing

Since this system involves many different hardware and software components, each must be tested so that we have a reasonable guess of how well or how poorly we can expect the composite system to initially behave.

Sections

5.1.1 Software
5.1.2 Hardware

     
Next: 5.1.1 Software Up: 5 Testing Plan Previous: 5 Testing Plan

author(s): Eric D. Baker
last update: 05 May 1999 5:02p by Eric D. Baker