Weekly Report 6

Category: Weekly Report
From: Kevin Berry
Date: 2/20/2001
Time: 6:09:44 PM
Remote Name: 152.2.142.146

Comments

Action Items: 1. Finalize setup for measuring device 2. Look at image algorithms 3. Get old pictures taken of high and low levels of the creek 4. Design Specification I

Outstanding Problems: 1. Learn C/C++, Perl and/or Tina Lib. 2. Tie down device better to minimize movement during high water

Plans to Address Outstanding Problems: 1. Decide which languages will serve best 2. Talk to client again about best methods for measuring daytime and nighttime depth. 3. Talk to client about ways to tie down the measuring device better

Hours Worked for Each Team Member 1. This week Ashes Ganguly 4.5 Alex Giouzenis 4 Kevin Berry 4 Ruigang Yang 4 2. Totals Ashes Ganguly 17.5 Alex Giouzenis 19 Kevin Berry 18 Ruigang Yang 18

Milestones 1. Accomplished a) Understand MS Project b) Completed Contract II 2. Approaching a) Design Specification I 3. Problems/Slips a) None at this time