Weekly Report 7

Category: Weekly Report
From: Kevin Berry
Date: 3/1/2001
Time: 2:03:55 PM
Remote Name: 152.19.211.22

Comments

Weekly Team Report #7 Team #6

Action Items: 1. Finalize setup for measuring device 2. Look at image algorithms 3. Get old pictures taken of high and low levels of the creek 4. Maintenance Manual Draft due March 6th

Outstanding Problems: 1. Learn C/C++, Perl and/or Tina Lib. 2. Tie down device better to minimize movement during high water

Plans to Address Outstanding Problems: 1. Decide which languages will serve best 2. Talk to client again about best methods for measuring daytime and nighttime depth. 3. Talk to client about ways to tie down the measuring device better 4. Divide parts of Maintenance Manual to each group member

Hours Worked for Each Team Member 1. This week Ashes Ganguly 5.5 Alex Giouzenis 5 Kevin Berry 5.5 Ruigang Yang 5.5 2. Totals Ashes Ganguly 23 Alex Giouzenis 24 Kevin Berry 23.5 Ruigang Yang 23.5

Milestones 1. Accomplished a) Understand MS Project b) Completed Design Specification I 2. Approaching a) Maintenance Manual Draft 3. Problems/Slips a) Minor slip in the interface definition and beginning the coding process