Weekly Team Report #8 Team #6

Action Items: 1. Finalize setup for measuring device 2. Look at image algorithms 3. Get old pictures taken of high and low levels of the creek 4. Maintenance Manual Draft due March 6th

Outstanding Problems: 1. Learn C/C++, Perl and/or Tina Lib. 2. Tie down device better to minimize movement during high water 3. Camera and measuring device moved some during heavy rain and water 4. In-class presentation on March 6th

Plans to Address Outstanding Problems: 1. Decide which languages will serve best 2. Talk to client again about best methods for measuring daytime and nighttime depth. 3. Talk to client about ways to tie down the measuring device better 4. Discuss Maintenance Manual again as a group 5. Discuss in-class group presentation

Hours Worked for Each Team Member 1. This week Ashes Ganguly 4 Alex Giouzenis 3.5 Kevin Berry 4 Ruigang Yang 4.5 2. Totals Ashes Ganguly 27 Alex Giouzenis 27.5 Kevin Berry 27.5 Ruigang Yang 28

Milestones 1. Accomplished a) Understand MS Project b) Working on Maintenance Manual Draft 2. Approaching a) Maintenance Manual Draft 3. Problems/Slips a) Minor slip in the interface definition and beginning the coding process