Virtual Time: a GPS example
connection ?i {(aik, Lik)}
1 1/3 {(0,1)}
2 1/3 {(0,2)}
3 1/3 {(0,2)}
Estimated finish time for p11 = 0 + 1/(1/3) = 3
Estimated finish time for p21 = 0 + 2/(1/3) = 6
Estimated finish time for p31 = 0 + 2/(1/3) = 6